Scheduling Functions
Open Diary in the menu (its first tab is Diary) for the full schedule at /schedule. The page is headed Diary, with the dates it is showing beneath the heading. On Today, The day across your team is a snapshot with links to the visits; use Diary to plan and change bookings.
- Create checks with property, date, time band, and assigned engineer (the property search finds an address, a postcode, a tenant or a client, and once a property is chosen At this property shows its tenant and client, as on Create job), or add one to the to-book list with no date yet (see Work: Every Visit in One Place). The date must be from 2000 up to ten years ahead, and an end time must be after the start time: Schedule check says so before it saves, with one message for a mistyped date. A date before today is allowed (to log a visit that already happened) but is pointed out first, as on Create job. A precise start time, under More details, replaces the visit window: save a check with Morning chosen and a start of 14:00 and it is stored with the time alone, so the Diary week, the day view and Edit all agree, and the form says so beside both fields. A date in the 2 months before the property’s due date asks, beside it, whether to keep the renewal date or start a new year from the visit (see Renewal Lifecycle and Reminders).
- View the team calendar with engineer, property, and client lanes on Week (Day shows engineer runs, and Month has no lanes) and an unassigned pool of open visits. Finished work that nobody was on is not in that pool: on Week and Day it is listed apart under Done, no engineer, shown as done, with no Assign and no dragging.
- Under engineer lanes, every active engineer has a lane even with nothing booked, so each is somewhere to drop a visit. So does the manager signed in (the “(You)” that Schedule check and Create job offer when you assign work), every day, even when they hold nothing; anyone else who holds a visit in the days shown gets a lane too.
- Jobs booked on Work (a service, a repair, an installation) show in the Diary beside the checks, with their type. Drag one to another day, engineer or run, as you would a check: a job with visits moves the visit you dragged, and a job without moves the job itself. A finished job or visit (completed, invoiced, cancelled or no access) keeps its day and does not drag. A move onto an engineer who is already booked then says so, and the engineers it moved between are told (the one taking it over, and the one it left). Assign on a card stays a check’s: an unassigned one shows Assign on job page, and opening a job opens its own page. A booked job still counts towards an engineer’s double-booking. Past jobs and checks imported from your old system are not in the Diary: they are history, so they never fill a day or the unassigned pool. The unassigned pool holds only open visits: a job that is completed, invoiced, paid or closed as no access is never offered for an engineer, whatever its booked day; if nobody was on it, it reads Done, no engineer instead (the same in The day across your team on Today).
- A job with more than one visit shows once per visit, each as its own booking on its own day and engineer, labelled Visit 2 of 3; every one opens the job’s own page, where a visit is booked, moved or cancelled.
- Switch between Week, Day (a dispatch board with a time rail and a live now line, its clock in UK time in the rail, where visits at the same time sit side by side) and Month (counts per day, with how many are done (finished work counts as done whether or not an engineer was on it), how many are unassigned (open work only, never finished work) and N overdue on a day that holds overdue visits) at the top of the Diary. Day runs from 08:00 to 20:00 and stretches to take in an earlier or later visit, so a 07:30 start or a 23:15 call-out sits in the Diary rather than off it. In Day, visits with no set time (All day, or no window) sit in an Anytime strip under each engineer, above the first hour.
- Choosing Day from a week or month that holds today opens on today, not on the Monday the week starts on; from any other week or month it opens on the one you were looking at. On a wide screen the Week board opens with Monday to Friday in view and the earlier days not hidden behind the engineer column; if the week is wider than the screen it scrolls a whole day at a time, never leaving a day cut in half. On a phone the board is a window of at most three quarters of the screen that you scroll inside, with a fade at the edge when there is more to the side, and the page itself scrolls past it. On a phone, Day shows one engineer’s run at a time: choose the engineer from the buttons above the board (each with its count of visits), so nothing hides behind a sideways scroll. An engineer’s name wraps rather than being cut short.
- Rest the pointer on a visit, or tab to it, and its card opens beside it: the time, status and engineer; the tenant or occupant (c/o the landlord or agent, or Homeowner), the address and their number; access notes and keys; the customer contact and reference; for a gas safety check, when the certificate runs out and the last check; the appliances on file; office notes; and for finished work, when it finished and the result, or why there was no access. Open check (or Open job) goes to the visit. On a touchscreen the first tap opens the card and a second tap opens the visit; on a phone the card rises from the bottom of the screen.
- Finished work (Completed, Record generated, Invoiced, Paid) stays on its day with a tick and quieter text. A visit closed with no access shows as No access, in amber and with no tick, because no certificate was made and the property is still due. Neither counts as a double-booking any more. In Day each visit names its status, and its edge takes the status colour: green when finished, amber for no access or awaiting parts.
- Every Day card and Anytime chip carries a status pill in the same words as Work (Scheduled, In progress, Submitted, Record generated and so on). A visit past its date and not done shows Visit overdue beside its status on Week and Day and in the unassigned pool, and a gas safety check does on the Gas safety checks list and its own page (Overdue on its own stays for a certificate or property that is past its check date); one an engineer finishes early with Mark done stays on its booked day, marked Done early with the day it was done, while a job the office completes from the detailed job list before its booked day ends its visit today, so it is never left on a day that has not come.
- Book and Reschedule on a check or job, and Move on a job’s visit, note a date before today before you save: it is allowed, for logging a visit that already happened, and the visit shows as Visit overdue until the work is completed. A blank date is flagged under the date field, which takes focus.
- Drag to assign or reschedule across morning, afternoon, and evening bands. On a touchscreen, tap Assign on an unassigned card to pick an engineer (or Leave unassigned) instead of dragging.
- A drag is a coarse reschedule: it moves the date and band and clears any precise start time. In the property or client lanes a drag keeps the engineer and moves only the date and band.
- See clash warnings for internal double-bookings before they reach the field.
- Two visits clash (Double-booked, on Week and Day) when they are for the same engineer on the same day and their times overlap. A visit with a start and an end time uses them, one with only a start time counts as an hour (60 minutes), one with only a band (Morning, Afternoon or Evening) covers that band, and one with no time at all never clashes. Visits that only meet (10:00 to 11:00, then 11:00 to 12:00) do not clash, and a visit that is over (finished, a check the engineer has submitted, or no access) clashes with nothing. Work on the same visit never clashes with itself. Booking a job on Work, scheduling a check or editing one (Schedule check, or Edit on its page), Reschedule on a job or on a gas safety check’s page, and a drag or Assign in the Diary or a drag on My week use the same rule: each still saves, and says so when the slot double-books the engineer (Check scheduled, and it double-books the engineer: they already have a visit at that time).