Docs/Quickstarts

Quickstart: Run Your First Gas Safety Check

This quickstart runs a single gas safety check end to end, from an empty workspace to one delivered record.

For: New workspaces3 min read4 sections

Run One Check End To End

  1. 1Create one client, one property, and the property’s appliance register.
  2. 2Schedule a check on that property and assign an active engineer (or yourself in sole-trader mode).
  3. 3Open My Checks on a phone, capture appliance readings, record any defects, add photos, and capture signatures.
  4. 4Submit the check, then review it in the office and confirm the appliance results and outcome.
  5. 5Generate the gas safety record and deliver it to the tenant and the client.
  6. 6Confirm the renewal date is set so the next check is chased automatically.

Why Run A Pilot First

Treat the first check as a production rehearsal. The goal is not only to prove a record can be created; it is to prove the handoff between scheduling, capture, review, generation, and delivery works before you load a full portfolio.

  • A clean pilot exposes missing certificate identity details before they print on real records.
  • It confirms your engineers can capture on real hardware, not just in theory.
  • It confirms tenants and clients receive the record the way you expect.

What Good Looks Like

A healthy Manifold workspace tells a complete compliance story without anyone explaining it. An office user should be able to open a property and understand its client, appliances, last record, current status, open defects, and next renewal from the records themselves.

  • Property addresses and client names read the way the landlord recognises them.
  • Every property has a current appliance register, so checks test the right equipment.
  • Compliance status on the dashboard matches the latest record on each property.
  • Open defects carry forward, so the next engineer arrives with context.
  • Records contain reviewed evidence and avoid internal scheduling or diagnostic detail.

Treat the First Job as a Rehearsal

The point of a pilot is not to prove a record can exist; it is to prove the handoff between scheduling, capture, review, generation, delivery, and renewal is reliable before real volume depends on it.

  1. 1Build the smallest complete version: one client, one property, one appliance register, one check.
  2. 2Run it through mobile capture, office review, record generation, tenant and client delivery, and renewal scheduling.
  3. 3Use what you learn to fix certificate identity, required fields, and delivery wording.
  4. 4Only then import the wider portfolio.

Was this page useful?